Many landed buyers plan to change the house they buy. URA treats works on a landed house as either additions and alterations (A&A) or reconstruction, and the same tests apply to terrace, semi-detached and detached houses.
This guide sets out where the line falls and the limits a changed or rebuilt house has to meet. It is a plain-English summary of URA’s published guidelines, not a substitute for advice from a qualified architect or engineer.
Works count as additions and alterations only if they meet all five of these conditions:
Works that do not meet those conditions are treated as reconstruction. Two changes count as reconstruction whatever the percentages:
Since 11 May 2015, all landed housing has followed URA’s envelope control guidelines. The overall height is capped at 12 m in a designated two-storey estate and 15.5 m in a three-storey estate. An attic may be allowed within that envelope.
New additions and alterations to a house approved under earlier guidelines must also fit within the permissible envelope.
How landed housing areas work →
For a bungalow, URA limits how much of the plot the building may cover. There are two figures.
| Location | Sub-control (max) | Site coverage (max) |
|---|---|---|
| Within a Good Class Bungalow Area | 35% | 45% |
| Outside the Good Class Bungalow Areas | 40% | 50% |
The sub-control measures the area up to the external façade, including balconies, planters, bay windows and roof terraces. Half of the car porch roof is counted, and sun-shading features are left out. The overall site coverage measures the building footprint and every feature raised 1 m or more above the ground, seen from above.
URA sets no site coverage control for terrace houses.
An older house may have parts that do not meet today’s guidelines, such as a shallow front setback. In additions and alterations or reconstruction, an existing non-conforming structure may be kept on these conditions:
If the retained structure is later demolished, URA must be notified at once and the new works must then comply with the current guidelines.
Looking for a newly built house instead? See brand-new landed homes for sale.
Tell us what you have in mind and we will shortlist landed homes for you to view. Choose an agent or contact the Finest SRI team.
Rules are from URA’s development control handbooks, read on 20 November 2026: additions and alterations to landed housing for bungalows, semi-detached houses and terrace houses, bungalow site coverage, terrace plot size and envelope control. URA may vary its guidelines for a particular site. Confirm current requirements with URA and take professional advice before transacting.