Rebuild or Renovate a Landed House: What URA’s Rules Allow

Many landed buyers plan to change the house they buy. URA treats works on a landed house as either additions and alterations (A&A) or reconstruction, and the same tests apply to terrace, semi-detached and detached houses.

This guide sets out where the line falls and the limits a changed or rebuilt house has to meet. It is a plain-English summary of URA’s published guidelines, not a substitute for advice from a qualified architect or engineer.

Additions and Alterations (A&A)

Works count as additions and alterations only if they meet all five of these conditions:

  • The added gross floor area is not more than 50% of the approved gross floor area.
  • Not more than 50% of the external walls are removed or replaced.
  • Structural changes do not exceed 50% of the existing building. Examples are replacing or adding columns and beams, and reconstructing floor slabs.
  • If the whole roof is changed, no storey is added.
  • If an attic is added, the increase in gross floor area is less than 50%.

When Works Count as Reconstruction

Works that do not meet those conditions are treated as reconstruction. Two changes count as reconstruction whatever the percentages:

  • An increase in storey height, including a roof change that adds a storey.
  • A change in housing form, for example from a semi-detached house to a bungalow.

Height and Envelope for a Changed or Rebuilt House

Since 11 May 2015, all landed housing has followed URA’s envelope control guidelines. The overall height is capped at 12 m in a designated two-storey estate and 15.5 m in a three-storey estate. An attic may be allowed within that envelope.

New additions and alterations to a house approved under earlier guidelines must also fit within the permissible envelope.

How landed housing areas work →

Site Coverage for Detached Houses

For a bungalow, URA limits how much of the plot the building may cover. There are two figures.

LocationSub-control (max)Site coverage (max)
Within a Good Class Bungalow Area35%45%
Outside the Good Class Bungalow Areas40%50%

The sub-control measures the area up to the external façade, including balconies, planters, bay windows and roof terraces. Half of the car porch roof is counted, and sun-shading features are left out. The overall site coverage measures the building footprint and every feature raised 1 m or more above the ground, seen from above.

URA sets no site coverage control for terrace houses.

Keeping Part of an Existing House

An older house may have parts that do not meet today’s guidelines, such as a shallow front setback. In additions and alterations or reconstruction, an existing non-conforming structure may be kept on these conditions:

  • At least 25% of the existing floor plate is kept as an integrated wing, and that wing includes the non-conforming part.
  • A Professional Engineer’s certification is provided.
  • Where the existing front setback is deficient, the house keeps a minimum of 2.4 m from the front boundary.

If the retained structure is later demolished, URA must be notified at once and the new works must then comply with the current guidelines.

Before You Buy a House to Rebuild

  • Check the designation. It decides the house types and storeys allowed. See landed housing areas.
  • Check the plot against the minimums. A plot must meet the minimum size and width for the house type you want to build. See types of landed property.
  • Ask for the approved plans. The approved gross floor area is the base for the 50% test.
  • Take professional advice early. An architect or engineer can tell you whether your plan is additions and alterations or reconstruction.
  • Compare land prices. See what landed homes cost per square foot.

Looking for a newly built house instead? See brand-new landed homes for sale.

Looking for a house to rebuild or renovate?

Tell us what you have in mind and we will shortlist landed homes for you to view. Choose an agent or contact the Finest SRI team.

Rules are from URA’s development control handbooks, read on 20 November 2026: additions and alterations to landed housing for bungalows, semi-detached houses and terrace houses, bungalow site coverage, terrace plot size and envelope control. URA may vary its guidelines for a particular site. Confirm current requirements with URA and take professional advice before transacting.